News

Stay up to date with the latest news, key releases, and brand updates—what's worth knowing.

Home News

News

News

Project Case | Shandong Yongfeng Lingang MPG100 Unit Electrical Control System
Popular

Project Case | Shandong Yongfeng Lingang MPG100 Unit Electrical Control System

Shaanxi Yuanda Complete Equipment Electrical Co., Ltd. completed the installation and commissioning of the electrical control system for the MPG100 unit of Shandong Iron and Steel Group Yongfeng Lingang Co., Ltd., and deployed routine inspections and intelligent inspections; the control, interlocking, and protection functions are normal and meet the requirements of blast furnace production and operation.

Read More →
AllBrand NewsCompany NewsCustomer StoriesNew Product Launch
Project Case | Shandong Yongfeng Lingang MPG100 Unit Electrical Control System
2026-10-21 Customer Stories

Project Case | Shandong Yongfeng Lingang MPG100 Unit Electrical Control System

Shaanxi Yuanda Complete Equipment Electrical Co., Ltd. completed the installation and commissioning of the electrical control system for the MPG100 unit of Shandong Iron and Steel Group Yongfeng Lingang Co., Ltd., and deployed routine inspections and intelligent inspections; the control, interlocking, and protection functions are normal and meet the requirements of blast furnace production and operation.

Project Case | Mabei Resettlement Building Power Supply and Distribution Project
2026-10-21 Customer Stories

Project Case | Mabei Resettlement Building Power Supply and Distribution Project

The power supply and utilization project for the Mabei Village urban village redevelopment project (Mabei Resettlement Buildings), undertaken by Shaanxi Yuanda Electric Power Engineering Co., Ltd., has been fully energized and put into operation with full capacity. The total capacity of public and dedicated transformers is 22,660 kVA (including 7,500 kVA for charging piles), serving 1,684 households, with 7 new power distribution facilities built, and it has passed the completion acceptance inspection.

Project Case | Lintong District-Wide Worry-Free Smart Charging Station Equipment Procurement
2026-10-21 Customer Stories

Project Case | Lintong District-Wide Worry-Free Smart Charging Station Equipment Procurement

Shaanxi Yuanda Complete Equipment Electrical Co., Ltd. completed the first batch of equipment supply for the Quanyu Wuyou Smart Charging Station in Lintong District, Xi'an, including box-type substations, 7kW single chargers, DC charging piles, and 320kW integrated heavy-vehicle charging machines, which have been accepted, commissioned, and put into operation.

Yuanda Electric Low-Voltage Drawer-Type Switchgear Product Introduction: Structure, Power Distribution Applications, and Suitable Scenarios
2026-09-17 New Product Launch

Yuanda Electric Low-Voltage Drawer-Type Switchgear Product Introduction: Structure, Power Distribution Applications, and Suitable Scenarios

Yuanda Electric releases an introduction to its low-voltage withdrawable switchgear products, covering the drawer unit structure, power distribution applications, and applicable scenarios, highlighting the product features clearly stated in the materials to facilitate selection communication and solution alignment.

Shaanxi Yuanda Electric Power Engineering releases brand news: based in Xi'an Economic and Technological Development Zone, building an integrated layout of electric power engineering and new energy
2026-09-16 Brand News

Shaanxi Yuanda Electric Power Engineering releases brand news: based in Xi'an Economic and Technological Development Zone, building an integrated layout of electric power engineering and new energy

Yuanda Electric's subsidiary Shaanxi Yuanda Power Engineering Co., Ltd. released brand news. The company is based in Xi'an Economic and Technological Development Zone, and its business has expanded from power transmission and transformation engineering to new energy fields such as photovoltaics, energy storage, and charging piles, forming an integrated layout of power engineering construction, new energy supporting facilities, and complete equipment manufacturing.